Utilities Spine

Every building connects to one serviced corridor. Capacity is added by extending the spine, never by rebuilding it.

Power

Grid supply, on-site solar array and standby generation on a common ring.

Water

Harvested rainfall and borehole into treatment, reservoir and irrigation.

Thermal

Chilled water and cold chain serving process, storage and laboratories.

Data

Fibre spine and sensor network feeding the FairEarth OS control layer.

GREENHOUSENURSERYPROCESSINGLABORATORYPACKAGINGCOLD STOREWAREHOUSEENERGYINTAKEPHASE 2

Schematic only. Loads, redundancy and routing to be confirmed in the utilities design package of the feasibility study.