Capital Allocation

The structure of the raise is fixed. The weighting of each line is set by the feasibility study and the financial model, not asserted here.

01Pending model

Land and site works

Access, terracing, drainage, perimeter.

02Pending model

Cultivation structures

Greenhouse blocks, nursery, irrigation.

03Pending model

Process buildings

Processing hall, packaging, laboratory.

04Pending model

Utilities and energy

Power, water, thermal, standby capacity.

05Pending model

Equipment

Extraction, analytical, packaging lines.

06Pending model

Digital platform

FairEarth OS, sensing, control centre.

07Pending model

Working capital

First crop cycles, inventory, qualification.

08Pending model

Contingency

Held against design and construction risk.

No capital figures, percentages or returns are presented at concept stage. Allocation weightings follow the feasibility study and financial model.

The Investment
Musanze Campus
22 / 28
22 / 28 · Part X — The Investment