Capital Allocation
The structure of the raise is fixed. The weighting of each line is set by the feasibility study and the financial model, not asserted here.
01Pending model
Land and site works
Access, terracing, drainage, perimeter.
02Pending model
Cultivation structures
Greenhouse blocks, nursery, irrigation.
03Pending model
Process buildings
Processing hall, packaging, laboratory.
04Pending model
Utilities and energy
Power, water, thermal, standby capacity.
05Pending model
Equipment
Extraction, analytical, packaging lines.
06Pending model
Digital platform
FairEarth OS, sensing, control centre.
07Pending model
Working capital
First crop cycles, inventory, qualification.
08Pending model
Contingency
Held against design and construction risk.
No capital figures, percentages or returns are presented at concept stage. Allocation weightings follow the feasibility study and financial model.